Banter Message Board

HC Pirate

Joined: 10/21/05 Posts: 173
Likes: 156


ALL work (bridges overpasses, etc) scheduled to be done summer of 2020.


some of the route from Exit 49 (Concord Mills exit) to Exit 68 already four or more lanes will need to be repaved. Travel is greatly improved but if you do want a way around I would suggest the "Enochville Shortcut" take the Webb Rd exit going south to Hwy 29 south. Take Hwy 152 in China Grove to Saw Rd then left onto Enochville Ave to Charlie Miller Road then right on Hwy 3 and left on Kannapolis Parkway to I85 at SuperTarget Exit 54. Consider yourself "lucky" on your easy ride on I77 :)
[Post edited by HC Pirate at 10/07/2019 3:27PM]

(In response to this post by ecukid79)

Posted: 10/07/2019 at 3:22PM



+0

Insert a Link

Enter the title of the link here:


Enter the full web address of the link here -- include the "http://" part:


Current Thread:

Support BYB: Shop at Amazon!

vm309